Showing posts with label Reflections. Show all posts
Showing posts with label Reflections. Show all posts
Wednesday, November 11, 2009
Final Reflection!! =[
this is the final reflection that im doing for dtm. this week I put my grip tape on....thats basicly it oh and blog work. and thats it. i will post final photos if i have any
Wednesday, November 4, 2009
Reflection Term 4 Week 4
this week i finally finished my stencil and now all i need to do is lacker my board and evaulation!!! im going to probly do some of my eveluation at home too =]]
next week...nothing? (i hope)
next week...nothing? (i hope)
Wednesday, October 28, 2009
Reflection Term 4 Week 3
This week we had no DTM on monday, and today we are in the com labs.....so i will try and paint the rest of my board tomorrow. =] i think im going in early more then usual this week with tom to get our boards finished.....
i hope to get my board finally painted tomorrow and also cut my stencil out =]]]
i hope to get my board finally painted tomorrow and also cut my stencil out =]]]
Wednesday, October 21, 2009
Reflection Term 4 Week 2
This week on monday HALF ( =[ ) my board got sprayed and the rest of it will be sprayed on thursday (I HOPE) i should get my evluations stared very soon. if i dont do them in school time i SHOULD do them at home. so i will TRY and get them done but knowing me its going to take effert to try to do them. tomorrow i plan to get the rest of my board sprayed and get my design stencil sorted
next week i plan to get my grip tape on my board and i hope to spray my stencil on as well =] i think thats all a good plan. lets hope i get all that done
next week i plan to get my grip tape on my board and i hope to spray my stencil on as well =] i think thats all a good plan. lets hope i get all that done
Wednesday, October 14, 2009
Reflection Term 4 Week 1
well.... schools back in! and now we are getting into exam mode. we have had our normal double practical on monday, the 1st period we had we worked on our boards. i boged mine up then sanded it abit still MORE sanding to do....then painting it. the 2nd period we had we all went down to resene to pick our paint colours (i didn't need to pick one because mine is black and white and we have thoses colours at school!)
next week i plan to basicly finish off my board....or atleast start to spray it =]]]
peace out :p
next week i plan to basicly finish off my board....or atleast start to spray it =]]]
peace out :p
HOLIDAY REFLECTION!
in the holidays i went on a tramp around nelson lakes with school, tom was on the tramp too. its was for 5 days and.....i guess you could say it was fun, well i enjoyed it anyway. one day we walked for about 8 hours. one thing im proud of is that we did a 3 hour walk in 1 hour 25 :P
in the second week i went up to Levin to spend time with my dad, we went to New Plymouth for .....3(?) days then i spent the rest of the taime at his place. i went to my little cousins 3rd birthday. that was cool =]]] apart for that i guess nothing else really happend thats worth mentioning but i had a good "rest" all in all
in the second week i went up to Levin to spend time with my dad, we went to New Plymouth for .....3(?) days then i spent the rest of the taime at his place. i went to my little cousins 3rd birthday. that was cool =]]] apart for that i guess nothing else really happend thats worth mentioning but i had a good "rest" all in all
Wednesday, September 23, 2009
Reflection Term 3 Week 10
so far this week i have painted my board and i have also still been trying to find my art work. i hope to get the final one very soon. I have some possible ones so far but i still want to look. i will post some pictures of my board after i painted it in just a minute.
before the end of the week i plan to spray my board and get the art work on it asap! =]
before the end of the week i plan to spray my board and get the art work on it asap! =]
Reflection Term 3 Week 9
For the 1st period we had i did art work and then the second lesson i worked on sanding my board. so far i think i shall have a black and white panda on my board, just finding the right picture is harder then i thought it would be
i will be doing more work on sanding it throughout the week and will be painting it next week
i will be doing more work on sanding it throughout the week and will be painting it next week
Wednesday, September 16, 2009
Reflection Term 3 Week 7
This week Tom and I only had DTM on Monday becasue we went on tournement for Underwater Hockey. I worked on the comps for one of our double lessions and for the other i worked on my board and sanding it down. i still keep changing my mind on what i want for my art work at the moment i think i shall have a black and white panda on the bottom of my board =]
Next week we have mocks =$
Next week we have mocks =$
Wednesday, August 26, 2009
Reflection Term 3 Week 6
This week on Monday we had our double but sadly we had a hole school assembly for our first period so we couldn't do work =[. I cut out the rest of my mould on our second period and sanded it down a bit. i helped maddy and kody sand their boards aswell. Tom helped me sand my board down. (THANK YOU TOM!!!)
Next week/ rest fo this week i plan to finish sanding my board and i want to get my art work sorted. then i would love to help some other people get theirs done too =]
Next week/ rest fo this week i plan to finish sanding my board and i want to get my art work sorted. then i would love to help some other people get theirs done too =]
Reflection Term 3 Week 5
we had double com lap on monday so we worked on designs and so on. im mainly up to date with my blog from what i know. On tuesday we worked on getting our boards cut out, sam noticed that her board was still not fully stuck together so Terry, her and I used f2 adhesive to stick it back together on the thursday lesson, both of those lessons i helped people cut their boards out and got most things sorted.
next week i plan to work on my board and get it closer to completeshion(?)
next week i plan to work on my board and get it closer to completeshion(?)
Monday, August 17, 2009
Reflection Term 3 Week 4
This week practical has been our main aim. i drew the cut out on my mould and some little art work on it too (sam helped). I helped some people finish their moulds too. I have also done some more work on.
next week i plan to do work on my blog to keep up to date. On Wednesday i plan to cut out my mould, and do the same on Thursday
next week i plan to do work on my blog to keep up to date. On Wednesday i plan to cut out my mould, and do the same on Thursday
Thursday, August 6, 2009
Reflection Term 3 Week 3
this week i have finished my mould and i am now going to work on the cut out asap. once thats done i shall cut it out. i helped put a speaker back together on monday with terry. We have been on the computers so i can't do some practle
i play to do alot more work on my mould next week. i want to get ahead
i play to do alot more work on my mould next week. i want to get ahead
Wednesday, July 29, 2009
Reflection Term 3 Week 2
This week i have layed another 4 or 5 boards on Monday i still haven't had the chance to lay mine yet. i hope to lay it on Thursday. Sam and i and a few others are the only ones left to lay our boards.
Next week i hope to lay my board if not on Thursday adn i want to pay more attention on my blog because i dont want to fall behind
Next week i hope to lay my board if not on Thursday adn i want to pay more attention on my blog because i dont want to fall behind
Reflection Term 3 Week 1
This week I helped to put down 5 boards into molds on Monday which we will pull out on Thursday and lay down some more boards. Today I am in the com labs to work on my blog and solid works designs. I hope to put down my board on Monday
On Monday i will help to put some more down in their molds. Terry wants all the class to have cast their boards in their molds before we cut the out because we need to use the wood work room to cut them.
On Monday i will help to put some more down in their molds. Terry wants all the class to have cast their boards in their molds before we cut the out because we need to use the wood work room to cut them.
Reflection Term 2 Week 10
Monday i did work on my mold. We changed how we did the boards to ply, fiberglass/epoxy, ply, fiberglass/epoxy, ply instead of ply, fiberglass/epoxy, flax, fiberglass/epoxy, ply. Then on Wednesday we did some strength test on the board and broke it and came to the conclusion that it was to thick and had not been in the mold for long enough. We did the testing on Wednesday after school because we were helping Terry out with the school open evening.
Next term i hope to lay down a board. To design and cut out my trucks . To draw my final solid works design. to design and cut out my stencil. I think i should also pay more attention to my blog next term then I have this term.
Next term i hope to lay down a board. To design and cut out my trucks . To draw my final solid works design. to design and cut out my stencil. I think i should also pay more attention to my blog next term then I have this term.
Reflection Term 2 Week 9
This week on Monday I did a job for Terry. The job was to fix a PA system on which the Tweeters had blown in the Music evening last week. On Wednesday I Had a com lab session in which I guess a mainly messed around on. On Thursday I helped Tom lay his board in the mold We did this by Laying down a layer of 4mm ply wood then a fiber glass and Epoxy Resin followed by the flax stringer and ten more fiberglass, Epoxy and plywood.
I will have to finish off my check list before the holidays.
I will have to finish off my check list before the holidays.
Reflection Term 2 Week 8
I haven't keep up to date with my Reflections so i can't remember what i did this week but in futre i will try and do them every Wednesday
Wednesday, June 10, 2009
Reflection Term 2 Week 7
This week i have worked on my mold, i have nearly finished my mold (i found out i have 6 pieces not 5). I think we are going to do a little more work on solid works some time soon but i'm not 100% sure when.
next week i plan to be completely finished on my mold and start to putting it together. i also want to check my stringer at some point soon
next week i plan to be completely finished on my mold and start to putting it together. i also want to check my stringer at some point soon
Subscribe to:
Posts (Atom)